WEST WING CONSTRUCTION UPDATE

Ego Pharmaceuticals West Wing reflects the quality and refinement of Ego Logis with its own individual flair. The addition of colour on the glazing panels of the south west corner makes a statement and reflects the bright interior of the facility. The mixed-use facility is in the final stages of construction with an anticipated hand over late this year. 

With great consideration of the environment, this structure aims to reduce its environmental impact through a number of features. The 50kWp of Solar Panels occupy the roof, contributing to powering the facility. 14 rainwater tanks have the ability to capture 2000 litres of storm water that sustain the irrigation system provided to garden beds. An incorporation of other sustainable elements includes; bike storeroom, low VOC paints, and external insulated high thermal performance PIR (Polyisocyanurate) panels which offer higher energy savings.

Share Post :